Two-bathroom remodel + drain rerouting
Full remodel of two second-floor bathrooms in a Crocker Highlands home near Lake Merritt. The property's main sewer lateral to the street had already been replaced, which simplified the back-of-house work — but the existing kitchen and laundry drain lines in the rear of the house weren't sized or pitched correctly for the new fixture load. We located the existing sewer routing along the driveway side of the yard, planned the tie-in to minimize excavation, and rerouted the kitchen and laundry drains with proper sizing and slope. Both bathrooms got full waterproofing with a traditional CPE plastic pan liner, pre-slope under the pan as a separate step, cement board walls, and porcelain tile. Permits pulled and inspected at each rough-in stage.


